Final | 12/15/2000 | 12/18/2000 | 12/18/2000 | A | CANC |
Alan Hauser
|
|
|
done 1/5/00 12/18/2000 8:53:17 AM
|
Final | 12/12/2000 | 12/13/2000 | 12/13/2000 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 12/12/2000 at 15:55:22. Contact: ###-####.combustion air vent required with in 12 in of ceiling. 12/13/2000 12:26:09 PM
|
Final | 12/12/2000 | 12/12/2000 | 12/12/2000 | A | FAIL |
Dixie Fellows
|
|
|
Added by Inspector: 411 On 12/12/2000 8:56:25 AM need comb air to w/h in closet at garage...finish prv to w/h in mech room
|
Final | 12/8/2000 | 12/8/2000 | 12/8/2000 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 12/08/2000 at 08:30:35. Contact: ###-####. called sandy to have somebody meet me with a ladder for attic access 12/8/2000 5:06:20 PM
|
Pressure Test | 11/20/2000 | 11/21/2000 | 11/21/2000 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/20/2000 at 15:28:25. Contact: ###-####.
|
Pressure Test | 11/17/2000 | 11/17/2000 | 11/17/2000 | P | NR |
Dixie Fellows
|
|
|
pres test--sandy --###-####--for pool heater
|
Final | 8/31/2000 | 9/1/2000 | 9/1/2000 | P | FAIL |
Alan Hauser
|
|
|
done #411 9/1/2000 12:33:26 PM
|
Final | 9/1/2000 | 9/1/2000 | 9/1/2000 | P | FAIL |
Dixie Fellows
|
|
|
Added by Inspector: 411 On 9/1/2000 no address posted..went to house i thought it was and it was locked
|
Final | 1/5/2000 | 1/5/2000 | 1/5/2000 | P | PASS |
Wes Worcester
|
|
|
Scheduled by a contractor via Hello! on 01/05/2000 at 08:34:23. Contact: ###-####.
|
Pressure Test | 12/9/1999 | 12/10/1999 | 12/10/1999 | A | PART |
Wes Worcester
|
|
|
Scheduled by a contractor via Hello! on 12/09/1999 at 12:50:49. Contact: ###-####. NO C/N P/T ok.
|
Rough-in | 12/9/1999 | 12/10/1999 | 12/10/1999 | A | FAIL |
Wes Worcester
|
|
|
Scheduled by a contractor via Hello! on 12/09/1999 at 12:51:23. Contact: ###-####. No C/N.
|
Pressure Test | 11/18/1999 | 11/19/1999 | 11/19/1999 | A | FAIL |
|
|
|
Scheduled by a contractor via Hello! on 11/18/1999 at 15:48:18. Contact: ###-####. Low pressure ok/ High pressure broken gauge- No pass.
|
Rough-in | 11/18/1999 | 11/19/1999 | 11/19/1999 | A | FAIL |
|
|
|
Scheduled by a contractor via Hello! on 11/18/1999 at 15:47:49. Contact: ###-####. C/N issued.
|