Final | 11/2/1999 | 11/2/1999 | 11/2/1999 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 11/02/1999 at 08:30:41. Contact: ###-####.
|
Final | 10/29/1999 | 10/29/1999 | 10/29/1999 | P | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 10/29/1999 at 09:41:10. Contact: ###-####. Need crawl space access
|
Pressure Test | 9/27/1999 | 9/27/1999 | 9/27/1999 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 09/27/1999 at 10:13:48. Contact: ###-####. HI fail
|
Rough-in | 9/27/1999 | 9/27/1999 | 9/27/1999 | A | PASS |
Jim Sly
|
|
|
Gas Tag #033171
|
Rough-in | 9/24/1999 | 9/27/1999 | 9/24/1999 | P | PART |
Alan Hauser
|
|
|
Andrea ###-#### Frame F/P-need gasline
|