Final | 12/10/1999 | 12/10/1999 | 12/10/1999 | P | PASS |
Alan Hauser
|
|
|
PAUL -CELL ###-#### -FN-RE-INSP
|
Final | 12/9/1999 | 12/9/1999 | 12/9/1999 | P | FAIL |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/09/1999 at 10:12:57. Contact: ###-####. Not ready will re-call.
|
Rough-in | 10/11/1999 | 10/12/1999 | 10/12/1999 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/11/1999 at 08:22:07. Contact: ###-####. Gas ok R/I ok
|
Rough-in | 10/6/1999 | 10/7/1999 | 10/7/1999 | P | PART |
Alan Hauser
|
|
|
Paul ###-#### Need a gas piping okay
|