Rough-in | 3/9/2000 | 3/10/2000 | 3/10/2000 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 03/09/2000 at 11:58:53. Contact: ###-####.
|
Rough-in | 1/27/2000 | 1/27/2000 | 1/27/2000 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 01/27/2000 at 07:49:50. Contact: ###-####. 1-60 # 1-20# test ok 1/28/00 9:40:04 AM
|
Rough-in | 1/5/2000 | 1/6/2000 | 1/6/2000 | A | FAIL |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 01/05/2000 at 15:50:22. Contact: ###-####. Not ready.
|