Final | 12/7/1999 | 12/8/1999 | 12/8/1999 | A | FAIL |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 12/07/1999 at 13:30:53. Contact: ###-####. No range hood duct.
|
Final | 12/8/1999 | 12/8/1999 | 12/8/1999 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 12/08/1999 at 10:15:28. Contact: ###-####. Final okay
|
Pressure Test | 10/20/1999 | 10/20/1999 | 10/20/1999 | P | PASS |
Dixie Fellows
|
|
|
reinspection ###-#### Gas and R/I ok
|
Rough-in | 10/20/1999 | 10/20/1999 | 10/20/1999 | P | PASS |
Dixie Fellows
|
|
|
reinspection ###-#### R/I ok
|
Rough-in | 10/18/1999 | 10/18/1999 | 10/18/1999 | P | FAIL |
Dixie Fellows
|
|
|
btu load 225,000---re-insp r/i-- empire ###-#### Gas pipe still undersized
|
Pressure Test | 10/13/1999 | 10/14/1999 | 10/14/1999 | A | FAIL |
Alan Hauser
|
|
|
Sabrina; ###-#### Need BTU lead
|