Final | 12/14/1999 | 12/15/1999 | 12/15/1999 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 12/14/1999 at 12:12:45. Contact: ###-####.
|
Final | 12/13/1999 | 12/14/1999 | 12/14/1999 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 12/13/1999 at 12:23:24. Contact: ###-####. Clearance at single wall pipe.
|
Pressure Test | 10/19/1999 | 10/20/1999 | 10/20/1999 | A | FAIL |
Dixie Fellows
|
|
|
###-#### p/t Seal R/A at 1st floor
|
Rough-in | 10/20/1999 | 10/20/1999 | 10/20/1999 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 10/20/1999 at 11:05:31. Contact: ###-####.
|
Rough-in | 10/19/1999 | 10/20/1999 | 10/20/1999 | A | FAIL |
Dixie Fellows
|
|
|
###-#### p/t r/I Gas failed
|