Pressure Test | 10/22/1999 | 10/22/1999 | 10/22/1999 | P | PART |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 10/22/1999 at 09:49:26. Contact: ###-####. PT ok, no access to equip.
|
Final | 10/20/1999 | 10/21/1999 | 10/21/1999 | A | FAIL |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 10/20/1999 at 15:48:16. Contact: ###-####. Test failed
|
Pressure Test | 10/21/1999 | 10/21/1999 | 10/21/1999 | P | FAIL |
Alan Hauser
|
|
|
SANDY-- ###-#### RE-INSP ON PRES TEST Pressure test failed
|
Pressure Test | 10/20/1999 | 10/21/1999 | 10/21/1999 | A | FAIL |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 10/20/1999 at 15:47:51. Contact: ###-####. Pressure test failed 2nd time.
|