Final | 5/9/2000 | 5/10/2000 | 5/10/2000 | A | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 05/09/2000 at 17:05:04. Contact: ###-####.
|
Rough-in | 10/27/1999 | 10/28/1999 | 10/28/1999 | A | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 10/27/1999 at 12:04:36. Contact: ###-####.
|
Rough-in | 10/26/1999 | 10/26/1999 | 10/26/1999 | P | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 10/26/1999 at 07:58:12. Contact: ###-####. Still need to make all corrections per notice 10/25/99
|
Rough-in | 10/22/1999 | 10/25/1999 | 10/25/1999 | A | FAIL |
Dixie Fellows
|
|
|
janet ###-#### r/I Seal R/h in basement; Dryer vent needs to be 6" due to # of elbows.
|