Final | 12/10/1999 | 12/10/1999 | 12/10/1999 | P | PASS |
|
|
|
###-####-jerry fn insp c/n removed ok for final occ
|
Final | 12/8/1999 | 12/9/1999 | 12/9/1999 | A | FAIL |
Dave Lightfoot
|
|
|
###-####-GERRAD --FN Water heater correction.
|
Pressure Test | 11/9/1999 | 11/9/1999 | 11/9/1999 | P | PASS |
Dixie Fellows
|
|
|
reinspection as per ms dixie Gas ok.
|
Pressure Test | 11/5/1999 | 11/5/1999 | 11/8/1999 | P | FAIL |
Dixie Fellows
|
|
|
JERRY ###-#### REINSPECT Gas failed both units.
|
Rough-in | 11/5/1999 | 11/5/1999 | 11/8/1999 | P | PASS |
Dixie Fellows
|
|
|
JERRY ###-#### REINSPECT
|
Pressure Test | 11/3/1999 | 11/3/1999 | 11/3/1999 | P | FAIL |
Dixie Fellows
|
|
|
JERRY ###-#### Not ready
|
Rough-in | 11/3/1999 | 11/3/1999 | 11/3/1999 | P | FAIL |
Dixie Fellows
|
|
|
###-#### JERRY Not ready
|