Final | 12/1/1999 | 12/2/1999 | 12/2/1999 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 12/01/1999 at 10:21:52. Contact: ###-####. Final ok.
|
Rough-in | 11/4/1999 | 11/5/1999 | 11/8/1999 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/04/1999 at 13:03:09. Contact: ###-####. R/I ok
|
Rough-in | 11/1/1999 | 11/2/1999 | 11/2/1999 | A | FAIL |
Dave Lightfoot
|
|
|
###-#### Need lower combustion air.
|