Final | 12/13/1999 | 12/13/1999 | 12/13/1999 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/13/1999 at 07:38:06. Contact: ###-####.
|
Pressure Test | 11/15/1999 | 11/16/1999 | 11/16/1999 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/15/1999 at 11:33:56. Contact: ###-####. Gas ok.
|
Rough-in | 11/15/1999 | 11/16/1999 | 11/16/1999 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/15/1999 at 11:33:30. Contact: ###-####. R/I ok.
|