Final | 11/30/1999 | 12/1/1999 | 12/1/1999 | A | PASS |
Dave Lightfoot
|
|
|
todd-- ###-#### fn insp
|
Final | 11/29/1999 | 11/30/1999 | 11/30/1999 | A | FAIL |
Dave Lightfoot
|
|
|
todd ###-#### fn Not ready.
|
Final | 11/30/1999 | 11/30/1999 | 11/30/1999 | P | FAIL |
Dave Lightfoot
|
|
|
TODD ###-#### Corrections.
|
Rough-in | 11/8/1999 | 11/9/1999 | 11/9/1999 | A | PASS |
Dixie Fellows
|
|
|
todd ###-#### r/I R/I and gas ok.
|
Rough-in | 11/5/1999 | 11/8/1999 | 11/8/1999 | A | FAIL |
Dave Lightfoot
|
|
|
###-#### todd Provide adequate combustion air need BTU load for F/WH
|