Final | 12/16/1999 | 12/17/1999 | 12/17/1999 | A | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 12/16/1999 at 15:29:13. Contact: ###-####.
|
Final | 12/8/1999 | 12/9/1999 | 12/9/1999 | A | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 12/08/1999 at 16:41:22. Contact: ###-####. Not ready.
|
Pressure Test | 11/12/1999 | 11/12/1999 | 11/12/1999 | P | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 11/12/1999 at 08:58:22. Contact: ###-####. Gas test ok.
|
Rough-in | 11/9/1999 | 11/10/1999 | 11/10/1999 | A | FAIL |
Dave Lightfoot
|
|
|
DENNIS-- ###-#### R/I Not sized correct- need flue clearance.
|