Final | 2/10/2000 | 2/11/2000 | 2/11/2000 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 02/10/2000 at 14:39:36. Contact: ###-####.
|
Final | 2/11/2000 | 2/11/2000 | 2/11/2000 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 02/11/2000 at 08:53:29. Contact: ###-####.
|
Final | 2/8/2000 | 2/8/2000 | 2/8/2000 | P | FAIL |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 02/08/2000 at 09:42:37. Contact: ###-####. Not ready for inspection
|
Rough-in | 1/28/2000 | 1/28/2000 | 1/28/2000 | P | FAIL |
Alan Hauser
|
|
|
brandon =###-#### re-insp r/i left c\n 1/31/00 9:15:37 AM
|
Rough-in | 1/24/2000 | 1/25/2000 | 1/25/2000 | A | FAIL |
Dave Lightfoot
|
|
|
brandon ###-#### r/i Correct fire place vent need unit heater installation instructions. 1/25/00 1:36:35 PM
|
Pressure Test | 11/29/1999 | 11/29/1999 | 11/29/1999 | P | CANC |
Dave Lightfoot
|
|
|
BRANDON ###-####
|
Pressure Test | 11/29/1999 | 11/29/1999 | 11/29/1999 | P | PASS |
Alan Hauser
|
|
|
|
Pressure Test | 11/23/1999 | 11/23/1999 | 11/23/1999 | P | FAIL |
Dave Lightfoot
|
|
|
brandon ###-#### Not sized per plan also added a fire place.
|