Final | 12/15/1999 | 12/15/1999 | 12/15/1999 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/15/1999 at 09:48:30. Contact: ###-####.
|
Pressure Test | 11/17/1999 | 11/18/1999 | 11/18/1999 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/17/1999 at 15:42:45. Contact: ###-####. Gas ok.
|
Rough-in | 11/17/1999 | 11/18/1999 | 11/18/1999 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/17/1999 at 15:43:07. Contact: ###-####. R/I ok.
|