Final | 12/20/1999 | 12/20/1999 | 12/20/1999 | P | PASS |
Alan Hauser
|
|
|
Bruce ###-####
|
Pressure Test | 12/6/1999 | 12/6/1999 | 12/6/1999 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 12/06/1999 at 11:00:04. Contact: ###-####. Wrong permit # called in.
|
Rough-in | 12/6/1999 | 12/6/1999 | 12/6/1999 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 12/06/1999 at 10:59:38. Contact: ###-####. Wrong permit # called in- Called Becky.
|
Pressure Test | 11/29/1999 | 11/30/1999 | 11/30/1999 | A | PASS |
Dixie Fellows
|
|
|
BRUCE ###-#### REINSPECTION Gas ok check BTU of furnace on final 1/2" line- owner verified 70 BTU.
|
Pressure Test | 11/26/1999 | 11/26/1999 | 11/26/1999 | P | FAIL |
Dixie Fellows
|
|
|
Bruce Bailey ###-#### Gas pipe undersized.
|