Final | 2/25/2000 | 2/25/2000 | 2/24/2000 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 02/25/2000 at 08:27:11. Contact: ###-####.
|
Rough-in | 11/19/1999 | 11/22/1999 | 11/22/1999 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/19/1999 at 12:14:53. Contact: ###-####. Gas ok.
|
Pressure Test | 11/18/1999 | 11/19/1999 | 11/19/1999 | A | FAIL |
Alan Hauser
|
|
|
###-#### Pipe undersized.
|
Rough-in | 11/18/1999 | 11/19/1999 | 11/19/1999 | A | PASS |
Alan Hauser
|
|
|
###-#### F/P ALSO INCLUDED
|