Permit Information
Permit NumberMEC99-03953
StatusFinaled
Name EMPIRE HEATING
Site Address 2169 E PARKSIDE DR
Project NameHILLSIDE
Customer Number 
ePlanReview 
Description
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final3/30/20003/30/20003/30/2000PPASS
DetailsWes Worcester
Scheduled by a contractor via Hello! on 03/30/2000 at 08:15:44. Contact: ###-####.
Final3/28/20003/29/20003/29/2000AFAIL
DetailsDave Lightfoot
###-#### Need FA and condensate drain 3/29/00 2:16:09 PM
Final3/24/20003/27/20003/27/2000AFAIL
DetailsWes Worcester
Val ###-#### Need range installed- C/C combustion air & fresh air requirements 3/28/00 9:05:15 AM
Pressure Test11/29/199911/30/199911/30/1999APASS
DetailsDixie Fellows
debbie ###-#### pres test Gas ok.
Rough-in11/29/199911/30/199911/30/1999APASS
DetailsDixie Fellows
debbie--- ###-#### r/i & pres test R/I ok.
Rough-in11/24/199911/24/199911/24/1999PNR
DetailsRuss Owen
val ###-#### Corrections posted at site have not been done, I think this was called in by the framer. Val.
Rough-in11/23/199911/23/199911/23/1999AFAIL
DetailsDave Lightfoot
conference on compustion air
Rough-in11/23/199911/23/199911/23/1999PFAIL
DetailsDixie Fellows
conference on compustion air
Pressure Test11/22/199911/22/199911/22/1999PFAIL
DetailsDixie Fellows
Scheduled by a contractor via Hello! on 11/22/1999 at 08:28:41. Contact: ###-####. Gas pipe undersized.
Rough-in11/22/199911/22/199911/22/1999PFAIL
DetailsDixie Fellows
Scheduled by a contractor via Hello! on 11/22/1999 at 08:28:08. Contact: ###-####. Corrections called Sabrina.