Pressure Test | 1/5/2000 | 1/5/2000 | 1/5/2000 | P | PASS |
Wes Worcester
|
|
|
Scheduled by a contractor via Hello! on 01/05/2000 at 08:49:20. Contact: ###-####.
|
Rough-in | 1/5/2000 | 1/5/2000 | 1/5/2000 | P | PASS |
Wes Worcester
|
|
|
Scheduled by a contractor via Hello! on 01/05/2000 at 08:50:00. Contact: ###-####.
|
Rough-in | 12/29/1999 | 12/29/1999 | 12/29/1999 | P | FAIL |
Wes Worcester
|
|
|
Scheduled by a contractor via Hello! on 12/29/1999 at 08:45:30. Contact: ###-####. Pressure test @ 12psi.; no fireplace permit, not ready.
|
Pressure Test | 12/17/1999 | 12/17/1999 | 12/17/1999 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 12/17/1999 at 08:30:55. Contact: ###-####. Called Sandy.
|
Rough-in | 12/17/1999 | 12/17/1999 | 12/17/1999 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 12/17/1999 at 08:30:29. Contact: ###-####. Called Sandy.
|