Conference | 4/3/2000 | 4/3/2000 | 4/3/2000 | A | PART |
Dixie Fellows
|
|
|
Combustion air also taken from a horizontal joist cavity.
|
Final | 4/3/2000 | 4/3/2000 | 4/3/2000 | P | PASS |
Dixie Fellows
|
|
|
Look just beyond the B vent and the compustion air will be there.... Lana ###-####
|
Conference | 3/30/2000 | 3/30/2000 | 3/30/2000 | A | PART |
Russ Owen
|
|
|
10" combustion air to be taken from attic, terminating as close as possible to gable vent
|
Final | 3/29/2000 | 3/29/2000 | 3/29/2000 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/29/2000 at 07:00:06. Contact: ###-####. Still has correction for combustion air. Other items ok. 3/29/00 2:12:37 PM
|
Final | 3/28/2000 | 3/28/2000 | 3/28/2000 | P | CANC |
Russ Owen
|
|
|
###-#### Unable to due, to many others. 3/29/00 9:59:46 AM
|
Final | 3/22/2000 | 3/22/2000 | 3/22/2000 | P | FAIL |
Russ Owen
|
|
|
###-#### Combustion air, fresh air, dryer vent flush to wall, called the ###-#### left message. 3/23/00 1:33:46 PM
|
Pressure Test | 12/13/1999 | 12/13/1999 | 12/13/1999 | P | PASS |
Wes Worcester
|
|
|
REINSPECT ###-####
|
Rough-in | 12/13/1999 | 12/13/1999 | 12/13/1999 | P | PASS |
Wes Worcester
|
|
|
###-#### REINSPECT
|
Pressure Test | 12/9/1999 | 12/10/1999 | 12/10/1999 | A | FAIL |
Wes Worcester
|
|
|
craig ###-#### lona Recall.
|
Rough-in | 12/9/1999 | 12/10/1999 | 12/10/1999 | A | FAIL |
Wes Worcester
|
|
|
craig ###-#### / lana Recall
|
Rough-in | 12/9/1999 | 12/9/1999 | 12/9/1999 | P | FAIL |
Wes Worcester
|
|
|
craig ###-#### r/I Lines not installed.
|