Final | 2/14/2000 | 2/15/2000 | 2/15/2000 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 02/14/2000 at 14:49:34. Contact: ###-####.
|
Rough-in | 12/17/1999 | 12/20/1999 | 12/20/1999 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 12/17/1999 at 13:24:44. Contact: ###-####. R/I & gas ok.
|
Rough-in | 12/14/1999 | 12/15/1999 | 12/15/1999 | P | FAIL |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 12/14/1999 at 15:57:59. Contact: ###-####. Gasline undersized.
|