Final | 2/10/2000 | 2/11/2000 | 2/11/2000 | A | PASS |
Dixie Fellows
|
|
|
###-#### REINSPECT
|
Final | 2/9/2000 | 2/10/2000 | 2/10/2000 | A | FAIL |
Dixie Fellows
|
|
|
###-####
|
Pressure Test | 12/14/1999 | 12/15/1999 | 12/15/1999 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/14/1999 at 16:47:41. Contact: ###-####. Tag #033106.
|
Pressure Test | 12/15/1999 | 12/15/1999 | 12/15/1999 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/15/1999 at 10:45:20. Contact: ###-####.
|
Rough-in | 12/14/1999 | 12/15/1999 | 12/15/1999 | A | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/14/1999 at 16:47:20. Contact: ###-####. C/N.. Need 1" clearance @ "B" vent insulate connectors (attic).
|
Rough-in | 12/15/1999 | 12/15/1999 | 12/15/1999 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/15/1999 at 10:44:58. Contact: ###-####.
|