Final | 2/29/2000 | 3/1/2000 | 3/1/2000 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 02/29/2000 at 10:32:00. Contact: ###-####.
|
Final | 2/28/2000 | 2/29/2000 | 2/29/2000 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 02/28/2000 at 16:28:11. Contact: ###-####. NEED 6" CLEARANCE...NEED PROTECTION POST AT FURN
|
Final | 2/28/2000 | 2/28/2000 | 2/28/2000 | P | CANC |
Wes Worcester
|
|
|
crawl space has been carpeted over called contractor to recall.Scheduled by a contractor via Hello! on 02/28/2000 at 11:26:28. Contact: ###-####.
|
Pressure Test | 1/18/2000 | 1/18/2000 | 1/18/2000 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 01/18/2000 at 10:19:19. Contact: ###-####.
|
Rough-in | 1/18/2000 | 1/18/2000 | 1/18/2000 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 01/18/2000 at 10:18:55. Contact: ###-####.
|