Final | 6/9/2000 | 6/12/2000 | 6/12/2000 | P | PASS |
Dave Lightfoot
|
|
|
larry ###-#### SIGNED OCC CARD
|
Rough-in | 3/6/2000 | 3/7/2000 | 3/7/2000 | A | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 03/06/2000 at 13:35:47. Contact: ###-####.
|
Rough-in | 3/2/2000 | 3/3/2000 | 3/3/2000 | A | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 03/02/2000 at 16:08:39. Contact: ###-####. Not ready/ 3/3/00 1:45:00 PM
|
Rough-in | 3/3/2000 | 3/3/2000 | 3/3/2000 | P | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 03/03/2000 at 09:45:55. Contact: ###-####. Cancl. 3/6/00 11:43:27 AM
|