Final | 3/9/2001 | 3/9/2001 | 3/9/2001 | P | PASS |
Dave Lightfoot
|
|
|
fn larry ###-#### sign occ card 3/9/2001 1:47:00 PM
|
Rough-in | 11/9/2000 | 11/9/2000 | 11/9/2000 | P | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 11/09/2000 at 09:46:38. Contact: ###-####.
|
Rough-in | 10/31/2000 | 11/1/2000 | 11/1/2000 | P | PART |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 10/31/2000 at 13:00:47. Contact: ###-####. 1st and 2nd floor r/i ok vents not ready 11/1/2000 3:43:16 PM
|