Final | 3/8/2000 | 3/8/2000 | 3/8/2000 | P | CANC |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 03/08/2000 at 09:06:40. Contact: ###-####.\\DONE BY ALAN
|
Pressure Test | 2/10/2000 | 2/10/2000 | 2/10/2000 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 02/10/2000 at 08:27:59. Contact: ###-####.
|
Rough-in | 12/29/1999 | 12/30/1999 | 12/30/1999 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/29/1999 at 16:50:14. Contact: ###-####. Ok to insul. Piping.
|