Permanent Occupancy | | 4/26/2002 | 4/26/2002 | | DONE |
|
|
|
|
BLD-Final | 4/18/2002 | 4/18/2002 | 4/18/2002 | | PASS |
|
|
|
Final, ok for perm. occ.
|
BLD-Final | 4/1/2002 | 4/1/2002 | 4/1/2002 | P | PART |
Jim Sly
|
|
|
fn insp - ###-####- bill C/N....Need fire dept Perm Occ signature. Need perm Occ status within 90 days of this notice. 4/1/2002 2:38:30 PM
|
FIR-Final | 4/1/2002 | 4/1/2002 | 4/1/2002 | A | PART |
Troy Cobbley
|
|
|
Given temp per Dave Miller. Will final when fire alarm is tested, everything else is OK
|
FIR-Final | 3/29/2002 | 3/29/2002 | 3/29/2002 | P | PART |
Troy Cobbley
|
|
|
Fire life/safety and fire sprinkler OK. Per Dave Miller I signed a temp on this permit and the vanilla finish until the fire alarm system is approved and finaled.
|