BLD-Final | 9/26/2006 | 9/27/2006 | 9/27/2006 | A | PASS |
Dave Hannah
|
|
|
bryan; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok for perm occ
|
Permanent Occupancy | | 9/26/2006 | 9/26/2006 | | DONE |
|
|
|
|
BLD-Final | 9/20/2006 | 9/21/2006 | 9/21/2006 | A | PART |
Dave Hannah
|
|
|
bryan ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley ok for temp occ ok for perm after mec gos perm
|
FIR-Final | 9/20/2006 | 9/20/2006 | 9/20/2006 | P | PASS |
Forrest France
|
|
|
Fire life safety passed inspection, missing ceiling tile at the kitchen area to be replaced prior to structural final.
|
BLD-Final | 9/15/2006 | 9/19/2006 | 9/20/2006 | P | NR |
Dave Hannah
|
|
|
craig; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
FIR-Final | 9/15/2006 | 9/19/2006 | 9/19/2006 | A | FAIL |
Forrest France
|
|
|
Inspection for the new type 1 hood suppression system and inspection for the project related fire alarm permit to monitor the hood system must be completed and approved prior to life safety final.
|