Permanent Occupancy | | 10/30/2006 | 10/30/2006 | | DONE |
|
|
|
|
FIR-Final | 10/27/2006 | 10/27/2006 | 10/27/2006 | P | PASS |
Forrest France
|
|
|
c/n items are complete, fire life safety passed.
|
BLD-Final | 10/10/2006 | 10/11/2006 | 10/11/2006 | A | PASS |
Dave Hannah
|
|
|
rachel link-- call 1st before insp -###-#### cell or jon davis ###-#### ok for temp occ ok for perm occ after fire gos perm
|
FIR-Final | 10/10/2006 | 10/11/2006 | 10/11/2006 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given until the upright head that is in a pendant position is corrected and the other sprig up is made vertical . Fire sprinkler work will be done by 5:00pm today. Fire extinguisher needs re-inspected.
|
Set Bond Amount | 10/11/2006 | 10/12/2006 | | A | |
|
|
|
Rachel or ###-####; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|