BLD-Final | 3/17/2008 | 3/17/2008 | 3/17/2008 | A | PASS |
Bob Archibald
|
|
|
Bld permit bld08-00427 issued to obtain CO.
|
DOC - Permit Finaled | | | 3/17/2008 | | DONE |
|
|
|
|
BLD-Conference | 3/7/2008 | 3/7/2008 | 3/10/2008 | P | PASS |
Jim Storey
|
|
|
Post: Do not occupy w/out CO done
|
Grading Inspection | 3/7/2008 | 3/7/2008 | 3/7/2008 | P | PASS |
Clint A Smith
|
|
|
All trash debris has been removed. Drain inlets inside the parking lot have been protected. CAS#460 ###-####
|
Grading Inspection | 3/6/2008 | 3/6/2008 | 3/6/2008 | P | PART |
Clint A Smith
|
|
|
Picking up pile of debris. Need to still install D.I. protection. Also instructed to start with the permiting for inside building. No permits have been issued yet. Will re-inspect for d.i. proection and the parking lot to be cleaned tomorrow. 3/7/08 CAS#460 ###-####
|
BLD-Conference | 3/6/2008 | 3/6/2008 | 3/6/2008 | P | PART |
Bob Archibald
|
|
|
Informed contractor permit and final inspections required prior to occupancy. CO required and to contact Ron Hill for information on permits.
|