MIS-Aging Inspection | 7/27/2009 | 7/27/2009 | 7/27/2009 | | PASS |
Alan Hauser
|
|
|
|
DOC - Permit Finaled | 7/27/2009 | 7/27/2009 | 7/27/2009 | P | PASS |
Alan Hauser
|
|
|
|
MIS-Aging Inspection | 5/26/2009 | 5/26/2009 | 5/26/2009 | | PART |
Alan Hauser
|
|
|
talked to home owner, she had a new furnace and a/c (heat pump) put in. she said pro flow had done the installation. i called ###-#### and left message with contractor, he called back and was surprised there wasn't a permit. i told him to take out permit and call for inspection
|
MEC-Conference | 3/25/2009 | 3/26/2009 | 3/26/2009 | A | FAIL |
Alan Hauser
|
|
|
talked to own, no work has been done yet. owner doesn't know who will being doing work, as it scheduled through el-ada
|