MIS-Aging Inspection | 2/8/2010 | 2/8/2010 | 2/8/2010 | | DONE |
Jim Storey
|
|
|
per mech insp.
|
DOC - Permit Finaled | 2/8/2010 | 2/8/2010 | 2/8/2010 | P | PASS |
Jim Storey
|
|
|
talked with troy the mech insp. he said that they had a air-balance report and was ok to final out this permit.
|
MEC-Conference | 12/7/2009 | 12/7/2009 | 12/8/2009 | P | PASS |
Dixie Fellows
|
|
|
per Lee at 2pm..left notice for josh..need engineered drawings
|
PLM-Conference | 12/7/2009 | 12/7/2009 | 12/8/2009 | P | PART |
Lee Rice
|
|
|
at 2pm.........met with josh and went over engineeed plan requirements for approval of a new kitchen. at the site. Inspectors fellows and van degrift left corrections to that effect.
|
PLM-Conference | 12/7/2009 | 12/7/2009 | 12/7/2009 | P | FAIL |
Bill VanDegrift
|
|
|
per Lee at 2pm provide a plumbing plan showing grease abatement- contact Walt Baumgartner Public Works Pretreatment for requirements ###-####. provide cross connection control at the water cooled condensor. a cross connection control survey with united water will be required prior to final. provide waste airgap at the prep sinks- ice bin drain, etc.
|