BLD-Final | 5/5/2010 | 5/5/2010 | 5/5/2010 | P | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 5/5/2010 | 5/5/2010 | 5/5/2010 | P | PASS |
Dave Hannah
|
|
|
|
MIS-Aging Inspection | 5/5/2010 | 5/5/2010 | 5/5/2010 | | PASS |
Dave Hannah
|
|
|
|
MEC-Final | 2/25/2010 | 2/25/2010 | 2/25/2010 | P | PASS |
Troy James
|
|
|
talked to generator manufacturer salesman what they recomment the generator to cycle on and off and he says once every week. I informed linda moore that the generator is complaint with the code and informed her that the generator has to cycle on and off on a regular basis to insure it will function when neccessary
|
MEC-Conference | 2/23/2010 | 2/23/2010 | 2/25/2010 | A | DONE |
Troy James
|
|
|
complaint of fumes from a generator
performed on site inspection to generator, talked to maintenance about how often generator automatically turns on, he did not know for sure and is going to report back to me
|