BLD-Conference | 7/26/2010 | 7/27/2010 | 7/27/2010 | A | PASS |
Jim Sly
|
|
|
|
DOC - Permit Finaled | 7/27/2010 | 7/27/2010 | 7/27/2010 | P | PASS |
Jim Sly
|
|
|
|
BLD-Conference | 7/23/2010 | 7/26/2010 | 7/26/2010 | A | CANC |
Jim Sly
|
|
|
Check back
|
BLD-Conference | 7/8/2010 | 7/15/2010 | 7/15/2010 | A | CANC |
Jim Sly
|
|
|
Check back.... Re-sched...
|
BLD-Conference | 7/6/2010 | 7/8/2010 | 7/8/2010 | A | DONE |
Jim Sly
|
|
|
Check back...... WIP
|
BLD-Conference | 7/2/2010 | 7/6/2010 | 7/6/2010 | A | PEND |
Jim Sly
|
|
|
Check back roof ..... Wesley Newlun ###-#### Re-sched..... Called and left V/M.
|
BLD-Conference | 7/2/2010 | 7/2/2010 | 7/2/2010 | P | PASS |
Jim Sly
|
|
|
Check back Stop Work. Wes Newlun ###-#### Permit Issued.
|
DOC - Permit Finaled | 7/2/2010 | 7/2/2010 | 7/2/2010 | P | PASS |
Jim Sly
|
|
|
|
BLD-Conference | 7/1/2010 | 7/2/2010 | 7/2/2010 | A | DONE |
Jim Sly
|
|
|
Roof W/O permit Stop work Order issued.....Contractor...Wesley Newlun
|
BLD-Conference | 7/1/2010 | 7/1/2010 | 7/1/2010 | P | CANC |
Jim Sly
|
|
|
roofing without a permit Ran out of time....Re-sched for fri AM
|
BLD-Conference | 7/15/2010 | 7/23/2010 | | A | |
Jim Sly
|
|
|
check back....
|