FIR-Conference | 3/14/2012 | 3/14/2012 | 3/14/2012 | P | DONE |
Troy Cobbley
|
|
|
I spoke to Jesse on the phone while at the job site and he stated that the fire hydrant has not been installed yet. I told him I would follow up in three weeks.
|
PLM-Final | 3/12/2012 | 3/12/2012 | 3/12/2012 | A | PASS |
Bill VanDegrift
|
|
|
the water service and backflow protection for this project was permitted and installed at the time of the initial construction. plm06-03761
|