BLD-Conference | 9/19/2013 | 9/25/2013 | 9/25/2013 | A | DONE |
Jim Sly
|
|
|
Jason said .....OK.
|
DOC - Permit Finaled | 9/25/2013 | 9/25/2013 | 9/25/2013 | P | PASS |
Jim Sly
|
|
|
|
BLD-Conference | 9/16/2013 | 9/19/2013 | 9/19/2013 | A | CANC |
Jim Sly
|
|
|
check back
|
BLD-Conference | 9/11/2013 | 9/16/2013 | 9/16/2013 | A | CANC |
Jim Sly
|
|
|
check back
|
BLD-Conference | 9/10/2013 | 9/11/2013 | 9/11/2013 | P | DONE |
Jim Sly
|
|
|
Check back....by 4:30 PM. 4:30 PM......Stop work order issued. Deadline to finalize Boise City erosion control permit has passed. No workers on site. Posted stop work tag on window of Track hoe. Double fee OK.
|
BLD-Conference | 9/9/2013 | 9/11/2013 | 9/11/2013 | A | CANC |
Jim Sly
|
|
|
By 4:30 PM
|
Set Bond Amount | 9/9/2013 | 9/11/2013 | 9/11/2013 | P | CANC |
Jim Sly
|
|
|
By 4:30 PM.
|
BLD-Conference | 9/6/2013 | 9/9/2013 | 9/9/2013 | A | DONE |
Jim Sly
|
|
|
report that they are doing work before erosion permit is obtained
Correction notice issued at 4:30 on Monday Sept. 9. Contact City of Boise PDS Dept. by Wed. Sept 11 by 4:30 PM to finalize Erosion control permit......or Stop work order will be issued. You are scheduled for a re-inspection At 4:30 on Wed 11th. Chris Fox ...Dahle Constr. ###-####..
|