DOC - Permit Finaled | 6/30/2014 | 6/30/2014 | 6/30/2014 | P | PASS |
Dave Hannah
|
|
|
|
MIS-Aging Inspection | 6/25/2014 | 6/25/2014 | 6/30/2014 | | PASS |
Dave Hannah
|
|
|
|
BLD-Conference | 3/24/2014 | 3/25/2014 | 3/25/2014 | A | CANC |
Dave Hannah
|
|
|
report doing work without permit. In each unit (4 units in 4 buildings) Creating utility closet for washer/dryer by combining existing washer closet with another closet. Electrical work also being done for dryer connection. Said that dryer hook up was installed in the floor. no strut work being done that needs permits
|
PLM-Conference | 3/25/2014 | 3/25/2014 | 3/25/2014 | A | PEND |
Daryl Spivey
|
|
|
working without permit moving and installing water and waste&vent for washers in 12 units in 4 4plex units. no permits were pulled and all permits are to be double fee'd...............ds
|
MEC-Conference | 3/25/2014 | 3/25/2014 | 3/25/2014 | P | FAIL |
Dixie Fellows
|
|
|
working without a permit..STOP WORK ISSUED...DOUBLE FEE ALL UNITS..SPOKE TO RITA ABOUT THE PERMITS
|
ELE-Final | 3/24/2014 | 3/25/2014 | 3/25/2014 | A | DONE |
Rex Boyles
|
|
|
report doing work without permit. In each unit (4 units in 4 buildings) Creating utility closet for washer/dryer by combining existing washer closet with another closet. Electrical work also being done for dryer connection. Said that dryer hook up was installed in the floor. walk thru with Zach from sublime electric they are relocating existing wiring from shed where old dryer locations where to inside closet and mounting surface mount dryer receptacles on floor in 16 units they did'nt think they needed permits
|