MIS-Aging Inspection | 6/11/2015 | 6/11/2015 | 6/11/2015 | | DONE |
Phil Shearer
|
|
|
|
DOC - Permit Finaled | 6/11/2015 | 6/11/2015 | 6/11/2015 | P | PASS |
Phil Shearer
|
|
|
|
PLM-Final | 3/3/2015 | 3/4/2015 | 3/4/2015 | A | PASS |
Jim Johnson
|
|
|
Gary Phone #: ###-####
|
PLM-Final | 3/2/2015 | 3/2/2015 | 3/2/2015 | P | FAIL |
Jim Johnson
|
|
|
Gary Phone #: ###-#### need R P for water cooled equipment in mechanical room contractor to recall when ready
|
PLM-Final | 2/27/2015 | 2/27/2015 | 2/27/2015 | P | CANC |
Tom Arcoraci
|
|
|
Gary Phone #: ###-####
|
PLM-Final | 2/19/2015 | 2/20/2015 | 2/20/2015 | A | PART |
Jim Johnson
|
|
|
Gary Phone #: ###-#### need rp installed for water supplied condenser,s need to relocate rp for ice machine to north wall of mechanical room no more than 5 feet above finish grade and away from electrical panel,s for final contractor to recall when ready
|
MEC-Final | 2/9/2015 | 2/10/2015 | 2/10/2015 | A | PASS |
Alan Hauser
|
|
|
hvac work permitted
|
PLM-Final | 2/6/2015 | 2/6/2015 | 2/6/2015 | P | PART |
Jim Johnson
|
|
|
Gary// needs permanent occupancy inspection// please call before Phone #: ###-#### made walk through with manager need additional backflow as noted need to have premius protection tested and certified need to install expansion tank on water heater need RP for ice machine need RP for coffee maker need RP for filter system need RP for espresso machine need RP on water supplied condenser,s need to make correction for final
|
MEC-Final | 2/6/2015 | 2/6/2015 | 2/6/2015 | P | PART |
Alan Hauser
|
|
|
Gary// needs permanent occupancy inspection// please call before Phone #: ###-#### called boise refrigeration and ask them to take out a permit for new rtu
|