Set Bond Amount | 9/8/2015 | 9/9/2015 | 9/9/2015 | P | PASS |
Jim Sly
|
|
|
Check back Obtained permit.
|
DOC - Permit Finaled | 9/9/2015 | 9/9/2015 | 9/9/2015 | P | PASS |
Jim Sly
|
|
|
|
BLD-Conference | 9/8/2015 | 9/8/2015 | 9/8/2015 | P | DONE |
Jim Sly
|
|
|
Re-roofing with no permits per complaint Stop work order issued.
|