BLD-Conference | 2/22/2016 | 2/29/2016 | 2/29/2016 | A | PASS |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 2/29/2016 | 2/29/2016 | 2/29/2016 | P | PASS |
Mike Jordan
|
|
|
Fermenting chamber is built from rigid insulation and is less than 10s.f. and is not a permanent structure. Not regulated by IBC. However, owner siad they would remove.
|
BLD-Conference | 2/19/2016 | 2/22/2016 | 2/22/2016 | A | DONE |
Mike Jordan
|
|
|
A correction notice notice was issued to obtain building permits (Needs to start process within 5 days) and all associated trade permits for the fermentation chambers that were constructed in the warehouse portion of the building. A follow up inspection has been scheduled for Feb 29th.
|
BLD-Conference | 2/19/2016 | 2/19/2016 | | P | |
Mike Jordan
|
|
|
|