BLD-Conference | 6/28/2016 | 6/30/2016 | 6/30/2016 | P | DONE |
Jim Sly
|
|
|
Obtained Permit
|
DOC - Permit Finaled | 6/30/2016 | 6/30/2016 | 6/30/2016 | P | PASS |
Jim Sly
|
|
|
|
BLD-Conference | 6/27/2016 | 6/28/2016 | 6/28/2016 | A | DONE |
Jim Sly
|
|
|
possible structural work being done without a permit Stop Work Order Issued. Roofing, Siding Painting, Interior Gut out........with plumbing, Mechanical and Electrical work going on. Reisch Constr. ###-####. Double Fee.
|