MIS-Aging Inspection | 12/13/2016 | 12/13/2016 | 12/19/2016 | | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 12/19/2016 | 12/19/2016 | 12/19/2016 | P | PASS |
Dave Hannah
|
|
|
|
MEC-Conference | 9/13/2016 | 9/13/2016 | 9/13/2016 | P | DONE |
Chad Schwendiman
|
|
|
Went and met Dewaine with the boise fire department on site today. We went inside and found that the coffee roaster has been removed from the premises
|
MEC-Conference | 9/8/2016 | 9/8/2016 | 9/8/2016 | P | FAIL |
Chad Schwendiman
|
|
|
Grant called and spoke with me yesterday the 7th. in regards to the propane fired coffee roaster. He wanted to discuss not venting the roaster to the outside. I explained to him that it needs to be installed per the manufactures installation instructions and if they called out for it to be vented that it needed to be. I told him I would like to meet on site to look over the manufactures installation instructions if he had them, and if he didn't have them get the make and model of the roaster so I can look them up. He said he would get back with me via phone.
|
MEC-Conference | 7/28/2016 | 7/28/2016 | 7/29/2016 | P | FAIL |
Chad Schwendiman
|
|
|
Look at the propane fire coffee roster. Meet Grant - I went by Grant wasn't there. They do have a propane fired roaster installed in the building and it is not currently vented. I left my card there with an employee and asked them to please haave Grant give me a call.
|