MIS-Aging Inspection | 11/30/2016 | 11/30/2016 | 11/30/2016 | | DONE |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 11/30/2016 | 11/30/2016 | 11/30/2016 | P | PASS |
Jim Storey
|
|
|
|
MEC-Conference | 8/18/2016 | 8/19/2016 | 8/19/2016 | A | FAIL |
Chad Schwendiman
|
|
|
8:00 am Kevin-- Please call before** Kevin knows that Eric created MIS***Per Eric Strole- extra plumbing, mechanical and electrical work being done without a permit Phone #: ###-#### - installing a new range vent. I let him know he needed to get a permit for the work and discussed with him how it needs to be installed.
|
PLM-Conference | 8/18/2016 | 8/19/2016 | 8/19/2016 | A | PASS |
Eric Strole
|
|
|
8:00 am Kevin-- Please call before** Kevin knows that Eric created MIS***Per Eric Strole- extra plumbing, mechanical and electrical work being done without a permit Phone #: ###-####-Plumbing permit is issued.
|
MEC-Conference | 8/17/2016 | 8/17/2016 | 8/18/2016 | P | CANC |
Chad Schwendiman
|
|
|
Kevin-- Please call before** Kevin knows that Eric created MIS***Per Eric Strole- extra plumbing, mechanical and electrical work being done without a permit Phone #: ###-#### - rescheduled for tomorrow
|
ELE-Conference | 8/17/2016 | 8/18/2016 | 8/18/2016 | P | DONE |
James Ady
|
|
|
Kevin-- Please call before** Kevin knows that Eric created MIS***Per Eric Strole- extra plumbing, mechanical and electrical work being done without a permit Phone #: ###-#### Electrical has been done, but not sure how long ago. No double fee. Will pull an electrical permit and straighten things out.
|
ELE-Conference | 8/17/2016 | 8/17/2016 | 8/17/2016 | P | CANC |
Rock A. Hudson
|
|
|
Kevin-- Please call before** Kevin knows that Eric created MIS***Per Eric Strole- extra plumbing, mechanical and electrical work being done without a permit Phone #: ###-#### reschedule for next day
|
PLM-Conference | 8/17/2016 | 8/17/2016 | 8/17/2016 | P | FAIL |
Eric Strole
|
|
|
Left correction notice that a plumbing permit is required.
|