BLD-Conference | 8/24/2016 | 8/25/2016 | 8/25/2016 | A | DONE |
Andy J. Long
|
|
|
Report of retaining wall without permit received from Public Works hillside engineer. Investigated site and spoke to homeowner regarding project. No activity at time of inspection.
Project is retaining wall repair, no new wall segments or foundation work. Rearranging boulders already on property and restoring portion of lawn with sunken grade with import of topsoil. Irrigation line relocation also part of project. No evidence of trespass or construction access on open lot below home.
Requested that some dirt/sediment in culdesac be swept clean and that if scope of work should change from what was described, PDS should be consulted to check for applicable permits. Note: Observed unsafe fire hazard level of weeds on lot below property and notified Code Enforcement.
|