BLD-Conference | 11/17/2016 | 11/18/2016 | 11/18/2016 | A | DONE |
Jim Sly
|
|
|
possible work without permits
|
DOC - Permit Finaled | 11/18/2016 | 11/18/2016 | 11/18/2016 | P | PASS |
Jim Sly
|
|
|
Talked to restoration company CTR........Leak in roof......Ceiling repair. Asbestos removal. new carpet. No permit required. Repair.
|