Information based on query as of Tuesday, June 25, 2024.
Permit Information
Permit NumberMIS17-00014
StatusFinaled
Name MILLER SUSAN LINDA
Site Address 3808 W TAFT ST
Project Namework without permits
Customer Number 
ePlanReviewNo
Description
Possible work being done on the garage to turn into a living space without permits
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
MIS-Aging Inspection5/25/20175/25/20175/26/2017 PASS
DetailsTony Young
DOC - Permit Finaled5/26/20175/26/20175/26/2017PPASS
DetailsTony Young
BLD-Conference2/22/20172/24/20172/24/2017PPEND
DetailsTony Young
Possible work without permits/// status review
BLD-Conference2/17/20172/22/20172/22/2017APEND
DetailsTony Young
Possible work without permits/// status review,, same as before
BLD-Conference2/10/20172/16/20172/17/2017APEND
DetailsTony Young
Possible work without permits/// status review,, SWO is still posted,, no apparent work going on,, permit still in the review status
BLD-Conference2/3/20172/10/20172/10/2017APEND
DetailsTony Young
Possible work without permits/// status review,, still in the received status
BLD-Conference2/2/20172/3/20172/3/2017APEND
DetailsTony Young
Possible work without permits/// status review,, still pending,, may need zoning approval for additional dwelling conversion,, talked with Colleen in planning
BLD-Conference2/1/20172/2/20172/2/2017PPEND
DetailsTony Young
Possible work without permits/// status review,, permit is in received status?
BLD-Conference1/28/20172/2/20172/1/2017APEND
DetailsTony Young
Possible work without permits/// status review
ELE-Conference1/19/20171/25/20171/30/2017ADONE
DetailsMark Moncarr
Talked to Linda Miller about electrical work done a licensed contractor. Contractor was supposed to pull a permit for work done. I have not seen a inspection requested at this time.
BLD-Conference1/25/20171/27/20171/28/2017PPEND
DetailsTony Young
Possible work without permits/// status review//
homeowner in process of obtaining permits
BLD-Conference1/20/20171/24/20171/25/2017PPEND
DetailsTony Young
Possible work without permits/// status review
BLD-Conference1/19/20171/20/20171/20/2017PPEND
DetailsTony Young
Possible work without permits
BLD-Conference1/18/20171/19/20171/20/2017PPEND
DetailsTony Young
Possible work without permits
ELE-Conference1/17/20171/17/20171/20/2017PDONE
DetailsMark Moncarr
Possible work without permits. Talked with Linda. She is currently in the process of working with Boise City.
BLD-Conference1/17/20171/17/20171/19/2017PPEND
DetailsTony Young
Possible work without permits,, possible adu,, Coleen with zoning is looking into it
PLM-Conference1/17/20171/17/20171/17/2017PFAIL
DetailsDaryl Spivey
Possible work without permits
work done without any permits....... no access. tenant at address was vague on work.........looks pretty well finished on changing garage to living space. Gas meter line and set installed with no meter yet...........stop work order put in window and correction notice with Tony Youngs phone number also............ds
MEC-Conference1/17/20171/17/20171/17/2017PFAIL
DetailsBen Livingston
Possible work without permits
need mechanical permit