MIS-Aging Inspection | 9/27/2017 | 9/27/2017 | 9/27/2017 | | DONE |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 9/27/2017 | 9/27/2017 | 9/27/2017 | P | PASS |
Jim Storey
|
|
|
ele issued
|
ELE-Conference | 6/23/2017 | 6/30/2017 | 6/29/2017 | A | DONE |
Rock A. Hudson
|
|
|
Idaho Power conmplaint- 230.24- Overhead service entrance conductors shall clear a flat through 3/12 pitch roof by 8' or 4/12 and steeper roof by 3' minimum. Electrical permit required for heater noted on BLD15-04178. Owner doing job by himself and making efforts to provide safety for overhead service entrance conductors.
|
ELE-Conference | 6/23/2017 | 6/23/2017 | 6/23/2017 | P | FAIL |
Rock A. Hudson
|
|
|
Idaho Power complaint- NEC 230.24- Overhead service entrance conductors shall clear a flat to 3/12 pitch roof by 8' or 4/12 and steeper by 3' minimum. BCC 4-05-18 Any extension or addition of electrical requires an electrical permit. Heater being added to powder bath as noted on BLD15-04178 requires permit. '
Spoke with owner. Slow moving will pull electrical permit for new service for shop and sub-feed house. Overhead service conductor supported off roof by wood cross members.
|