BLD-Conference | 6/3/2020 | 6/4/2020 | 6/4/2020 | A | DONE |
Mike Jordan
|
|
|
Has membrane been reinstalled? Membrane sctructure in place. Appears that 2 more membrane structures have been erected as well.
|
MIS-Aging Inspection | 4/22/2020 | 4/22/2020 | 4/23/2020 | | CANC |
Mike Jordan
|
|
|
|
MIS-Aging Inspection | 5/15/2019 | 5/15/2019 | 5/15/2019 | | FAIL |
Mike Jordan
|
|
|
|
MIS-Aging Inspection | 12/19/2018 | 12/19/2018 | 12/19/2018 | | FAIL |
Mike Jordan
|
|
|
Fabric has been reinstalled on frame.
|
MIS-Aging Inspection | 8/31/2018 | 8/31/2018 | 8/31/2018 | | PEND |
Mike Jordan
|
|
|
Noted that fabric has been removed from structure, but structure still erected at this time.
|
MIS-Aging Inspection | 1/31/2018 | 1/31/2018 | 1/31/2018 | | PEND |
Mike Jordan
|
|
|
|
BLD-Conference | 8/14/2017 | 8/22/2017 | 8/22/2017 | A | DONE |
Mike Jordan
|
|
|
Check on status. Per owners, they have met ith briggs engineering and Sundell architecture as of yesterday.
|
BLD-Conference | 8/7/2017 | 8/14/2017 | 8/14/2017 | A | DONE |
Mike Jordan
|
|
|
Check on status... membrane structure being erected with no permits. Nothing submitted as of today. Another building conferance has schedule. Will verify if plans have been submitted. if not will contact owner and issue possible 5 day notice.
|
BLD-Conference | 8/4/2017 | 8/7/2017 | 8/7/2017 | A | FAIL |
Mike Jordan
|
|
|
Building a membrane structure with not permit. A stop work was issud. Noted to office manager to submit plans and engineering for planning and zoning approval and all required inspections. A follow up inspection has been scheduled for next monday Aug. 14th. 2017.
|
BLD-Conference | 8/22/2017 | 9/22/2017 | | A | |
Mike Jordan
|
|
|
Check on status...
|
BLD-Conference | 8/4/2017 | 8/4/2017 | | P | |
Mike Jordan
|
|
|
|