BLD-Conference | 2/9/2018 | 2/9/2018 | 2/10/2018 | P | DONE |
Jim Sly
|
|
|
No trucks, no materials, no humans on site. Job appears to be completed. No on at home.
|
DOC - Permit Finaled | 2/10/2018 | 2/10/2018 | 2/10/2018 | P | PASS |
Jim Sly
|
|
|
|
BLD-Conference | 9/13/2017 | 9/13/2017 | 9/13/2017 | P | DONE |
Brandon Shaw
|
|
|
Tear off single layer cedar shake, re-sheet and cover with arch 30yrs shingles. Told contractor permit is required
|