MIS-Aging Inspection | 3/13/2019 | 3/13/2019 | 3/13/2019 | | PASS |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 3/13/2019 | 3/13/2019 | 3/13/2019 | P | PASS |
Mike Jordan
|
|
|
A building permithas been issued and finaled.
|
BLD-Conference | 6/22/2018 | 6/29/2018 | 6/29/2018 | A | DONE |
Mike Jordan
|
|
|
Plans have been uploaded to eplan as of 6-26-18.
|
BLD-Conference | 6/8/2018 | 6/22/2018 | 6/22/2018 | A | DONE |
Mike Jordan
|
|
|
Check on job and progress. Still no plans issued. Also noted no further work has been done, except for flooring, ok.
|
BLD-Conference | 6/1/2018 | 6/8/2018 | 6/8/2018 | A | DONE |
Mike Jordan
|
|
|
check on status. Check on job, no further work has been conducted. Appears that no plans or application has been submitted as of this date. A reinspection has been schedule for June 22nd. Will check on status and issue 5 day notice if needed.
|
BLD-Conference | 5/31/2018 | 6/1/2018 | 6/1/2018 | A | CANC |
Mike Jordan
|
|
|
|
BLD-Conference | 5/31/2018 | 5/31/2018 | 6/1/2018 | P | CANC |
Mike Jordan
|
|
|
wall being built without permit. call Rock if questions
|
BLD-Conference | 6/1/2018 | 6/1/2018 | 6/1/2018 | P | FAIL |
Mike Jordan
|
|
|
A correction notice was issued to stop work, and to submit plans to planning for all approvals and to obtain all required permits.
|